ocr: Construction OfAI Profit-Volume Chart Draw the graphs axes. The Y. or vertical axis should be labelled with E values against which profits and losses will be plotted. 1 The X. or horizontal axis should be labelled with unit values against which production and sales levels will be plotted. Plot the loss that will be incurred at a zero level of activity. 2 and This the will loss be a will point be point exactly A) equal on the to the vertical fixed axis costs of the which graph are those incurred regardless of the level of activity achieved. Find the preakeven point and plot the appropriate leve ...